Facade renovation in Babenhausen: Security for residents is going on!
Facade renovation in Babenhausen: Security for residents is going on!
in Babenhausen is currently working on the facade work at the high -rise "Im Erloch". As reports RheinMainverlag.de, a test engineer has no concerns about the risk of collapse of the building. Nevertheless, the residents were prevented in the nearby town hall to ensure their security. Working on facade removal has been running for a week and are essential because of the striking parts a risk.
"The protection of our residents has a top priority," explains Martina Löffler, head of the lower building supervision, which is present on site every day. The facade is gradually dismantled - up to one floor per day - and should be completely removed according to plan in about three weeks, in good time before the summer vacation. Additional cranes and lifting devices ensure that the work is more efficient. After the facade removal, the static harmlessness is confirmed in writing.
cracks and security
According to the test engineer, the cracks in the masonry for the age of the high -rise are not unusual and do not endanger the statics. These cracks are monitored with plaster brands. The property management has also ensured that all safety -relevant facilities such as risers and fire extinguishers are checked.
The evacuation was a necessary measure to prevent the impending danger of a building fall. Such scenarios are not the norm, but the increasing urbanization and dense development in cities keep bringing problems with dilapidated or incorrectly constructed buildings. As Kanzlei-herfurtner.de, property owners who are responsible for their buildings must act immediately if the risk of collapse threatens. This can lead to serious legal consequences if security is neglected.
Responsibility of the building supervision
The lower construction supervision plays a crucial role in this process. Your area of responsibility includes compliance with the building registration and construction planning law, which accompanies and ensures that every construction work is followed. This includes the examination of building applications, the monitoring of the construction work and, if necessary, the arrangement of immediate measures for violations, as describes [juraforum.de] (https://www.juraforum.de/lexikon/bau -supervision).
A meeting of owners who will take place with the mayor and the construction supervision next week should discuss further steps. The cooperation between the district, the city, craft companies and emergency services is described as exemplary and ensures that the situation in the "Erloch" is clarified as quickly as possible. After the final inspection by the construction supervision, the building will be released again if security is guaranteed.
Details | |
---|---|
Ort | Babenhausen, Deutschland |
Quellen |
Kommentare (0)