Asmushausen shines after renovation: new wall for 190,000 euros!
Asmushausen shines after renovation: new wall for 190,000 euros!
Asmushausen, Deutschland - In Asmushausen, a comprehensive renewal of the passage through the town is currently being implemented, which began in 2021. The work focuses on an old wall that dates from the 1920s and tends towards Asmusstrasse. This measure marks the end of the third construction phase and is part of a larger renovation project in the Hersfeld-Rotenburg district. The new wall is placed over the old, with the gaps being poured out with concrete on June 16. After a curing time of 28 days, paving and attaching a railing follow. The paved path to the houses above the wall to Asmusstrasse is also renewed. This measure is intended as a permanent solution and not only reports as a provisional, such as [https://www.hna.de/lokales/rotenburg-bebra/bebra-ort46578/erneuerung-der- Ort-alte-Mauer-in-erhaelt-stuetzwand-93784054.html).
The renewal of the wall is carried out by the company HS-Bau from Solz and its subcontractors Jacob and Co. deep and road construction. The total planned costs for the project amount to around 3.3 million euros, of which 2.2 million euros have already been spent on the first two construction phases. The last section is expected to cost one million euros. It was surprising that the renewal of the wall was originally scheduled two years ago and now costs 190,000 euros.
traffic adjustments and effects on residents
The construction site remains until the end of the year, whereby the last construction phase towards Cornberg will only be tackled after the wall has been completed. In order not to block the traffic completely, the passage street is only blocked on one side. This also brings with it some changes for the residents of Asmusstrasse. The Kersten farm has received a new access, while residents and visitors to the courtyard have to be redirected. The way to the Warteberg is also closed during the construction period. For emergencies, an asphalt path to seven houses is created on the quarry to secure access.
This project is part of a larger initiative in the district, which in 2023 invests a total of around 3.7 million euros in the renovation of district roads. One of the largest projects is to complete the renewal of the K73 in Asmushausen, which is jointly carried out with the city of Bebra. Hessen Mobil implements the projects on behalf of the district, which also includes the construction of a new slope support in Lüdersdorf, which is also the focus, such as [Hefrof] (https://www.hef-rof.de/news/2025/february/INVESTUTIEN-in-kreisstrasse-3-7--Fuer-- Mehrheit-auf-stressen/) emphasized.
Sustainable street infrastructure for the future
The renovations are part of a comprehensive road construction offensive, in which Hessen Mobil plans numerous construction projects on federal, state and district roads. In the Hersfeld-Rotenburg district alone, 15 construction measures are planned to help increase traffic safety. The state road network has suffered greatly through age-related loss of substance and extreme weather, so that many roads urgently need to be improved, as the [https://mobil.hessen.de/presse/22-bauprojekt-an-bundes-landes-und--undstrasse reports). This shows the need and relevance of the currently ongoing projects in Asmushausen and the surrounding area.
Details | |
---|---|
Ort | Asmushausen, Deutschland |
Quellen |
Kommentare (0)